Heart of the South West Productivity Strategy Consultation Response

011 Heart of the South West Productivity Strate

This document summarises findings from the South West Draft Productivity Strategy consultation period which ran between October-December 2017. It includes feedback from 58 individual responses to an online survey, in addition to 34 written representations and feedback gathered from two ‘LEP conversations’ (business events).